Twin City Radio Controllers  
            AMA Charter #383
                 1957 - 2012

------------------------------------
Home
------------------------------------
Annual Auction Info

------------------------------------
Our Flying Field
------------------------------------
------------------------------------
Join our Club
------------------------------------
Events

------------------------------------
Newsletters
------------------------------------
Photos
------------------------------------
Movies
------------------------------------

------------------------------------
TCRC Virtual Hangar
------------------------------------
Forum

------------------------------------
------------------------------------
FAQ
------------------------------------
RC Information
------------------------------------
Links
------------------------------------

Contact Us

------------------------------------
------------------------------------
AMA Website
------------------------------------
AMA District VII Website
------------------------------------
------------------------------------
2011 Mowing Schedule
------------------------------------
TCRC Merchandise
------------------------------------
Member Only

------------------------------------

                                              


 

Our flying site now has twelve airplane starting benches.  These can be easily towed to the top of the hill in case of spring time flooding.

Benches are to be towed three at a time with the quarter scale benches always at the end of the train and only one quarter scale in each group of three.  It will only take three trips to bring them all to the shed area during a flood.  The special tow bar can be found hanging on the peg board in the new tractor shed.  It will have a pin on either end.

A video in QuickTime format can be found by clicking here.  Note that it is a 4MB file and may take a while to download.

Instructions for towing:

  • Locate one of the three benches with the tractor towing mechanism.  They will have two metal brackets a the back of the starting bench.  (picture #1)
  • Using the three point hitch on the tractor and the special tow bar to connect the starting bench.  Raise the three point hitch to get proper clearance.  (picture #1)
  • Attach a second bench by using the hold down stake and pinning it to the table.  Note that some stand off blocks will be provided to ensure that the pin does not hit the ground during towing. (picture 3)
  • Attach a third bench in the same fashion as the second.  Note that only one quarter scale can be towed at a time and should be the last bench on the train.
  • Double check to make sure that the front of each bench will not hit the ground during towing.
  • Slowly drive the tractor up to the shed area.  Do not attempt to backup.  Use large turning radius to avoid binding.

During a flood, please also make sure you transport the picnic tables, sitting benches and chairs up to the shed area to avoid having them float off.  There is a small 4x8 trailer that an be used with the tractor to aid in the transportation.

Picture #1

Picture #2

Picture #3

Picture #4